Birzhevaya Bridge will be closed for the period of repair

Birzhevaya Bridge will be closed for the period of repair

This material (information) was produced, distributed and (or) sent by a foreign agent of RS-Balt JSC or relates to the activities of a foreign agent of RS-Balt JSC. 18+

In connection with the dismantling of the support from 21:00 April 10 to April 16, traffic on the Birzhevoy Bridge is closed. The scheme of public transport will change, the committee on transport reported.

Bus No. 10 will proceed from the final stop “Krestovsky Ostrov” along the existing route to Bolshoy pr. P.S., then along Bolshoi pr. , Palace Bridge and further along the existing route to the final stop “Baltic Station” (in both directions).

Bus number 191 – from the final stop “Okkervil River” along the existing route to the Palace Bridge, then along the Palace Bridge, Universitetskaya Embankment, Kadetskaya and 1st Lines V.O., Tuchkov Bridge, Bolshoi Pr. P.S. and further along the existing highway to the final stop “Metro Petrogradskaya” (in both directions).

Trolleybus No. 7 will proceed from the terminal stop “Tallinskaya Street” along the existing route to the Palace Bridge, then along the Palace Bridge, Universitetskaya Embankment, Kadetskaya and 1st Lines V.O., Tuchkov Bridge, Bolshoi Pr. Dobrolyubova, trans. Tatalikhina, trans. Nesterova, Syezzhinskoy st., Bolshoy pr. P.S., Zhdanovskaya emb. (back along Zhdanovskaya embankment, Bolshoy pr. P.S.) and further along the existing highway to the final stop “Novoladozhskaya street” (in both directions).

Source: Rosbalt

You may also like

Immediate Access Pro