MVCS: finalize technical file of water and sanitation project for Puente Piedra

As indicated by the Ministry of Housing, Construction and Sanitation (MVCS), The preparation of the technical file and the study of a water project that will benefit more than 3,000 inhabitants of the Puente Piedra district and that will require an investment of S / 29.2 million was completed.

This important water and sanitation project is in charge of the Safe Water Program for Lima and Callao (PASLC) of the MVCS. In addition, it will allow the residents of Block 7 and Block 10 of Puente Piedra to have new networks and household connections for drinking water and sewerage.

CAN SEE

PASLC representatives met with district leaders and were informed that the next step in the process to access water services will be the approval of the technical file. Then the preparatory acts for the convocation of the executing contractor of the work will begin.

It should be noted that PASLC is the entity that manages investment projects in water and sanitation in Sedapal’s area of ​​responsibility (Metropolitan Lima and Callao) in order to close the infrastructure gap in water and sewerage.

.

You may also like

Immediate Access Pro