Hybrid trains will arrive later in Valle de Carranza after the controversy with Cantabria and Asturias
The request from both communities to the CAF company included a series of hybrid trains for the Bilbao-Santander line. Those, like the rest, will arrive two or three years later.
-
listen to the page
listen to the page -
Euskaraz irakurri
Euskaraz irakurri: Karrantzak behar dituen tren hibridoek beranduago helduko dira Kantabriako eta Asturiasko aferaren ondorioz
He train affair of Cantabria and Asturias It has consequences in Euskadi. The hybrid trains that Valle de Carranza (Bizkaia) needs to connect Santander and Bilbao they were in the same demand as said trains. They are already two years late, and due to the design error, they will arrive even later. The Valle de Carranza line is obsolete and technical problems are common.
The request from both communities to the CAF company included a series of hybrid trains for the Bilbao-Santander line. Those, like the rest, will arrive two or three years later. This has a direct impact on Valle de Carranza, where they have spent years denouncing the lack of trains, drivers and maintenance.
As they explain from the local platform, half of the trains that pass through the town are at least an hour late, and over the years the situation has worsened. In 2002, the journey from Carranza to Bilbao took one hour, and two decades later, traveling the same route takes one hour and 20 minutes.
Source: Eitb

Alia is a professional author and journalist, working at 247 news agency. She writes on various topics from economy news to general interest pieces, providing readers with relevant and informative content. With years of experience, she brings a unique perspective and in-depth analysis to her work.